TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 433 of 1348

Table
1.
FIELD LEVEL PMCS - SEMI-ANNUAL - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
1
2
Figure 3.
Field Level PMCS Semi-Annual.
4
Semi-
Annual
Drawbar Airbag
Vent Line
Inspect airbag vent line 2223 (Figure 3, Item 1) for crimps
or blockage. Clean, repair, or replace vent line
(WP
0067).
Airbag vent line is crimped
or blocked.
5
Semi-
Annual
Turntable
a. Turn turntable from side-to-side and check turntable
(Figure 4, Item 2) for damage and freedom of movement.
Check turntable mounting bolts (Figure 4, Item 1) for
looseness. If turntable does not rotate or bolts are loose,
notify supervisor.
Turntable does not rotate
or bolts are loose.
1
2
Figure 4.
Field Level PMCS Semi-Annual.
If an air-operated grease gun does not purge the fitting,
use a hand-operated grease gun. If the part does not
purge, remove fitting and clean, install fitting and grease
again. If part still does not purge, refer to maintenance
task for that component. When using a grease gun, apply
lubricant to the fitting until clean lubricant squeezes out
of the part being lubricated.
TM 9-2330-342-23&P
0047
0047-3


Back to Top