PREPARATION PRIOR TO RAIL SHIPMENT - Continued
1
3
2
Figure 1.
Preparation Prior to Rail Shipment.
2.
Install reinforcement plate (Figure 2, Item 4) in holes (Figure 2, Item 8) in trailer chassis (Figure 2, Item 6).
1
2
3
4
5
6
7
8
9
11
10
Figure 2.
Preparation Prior to Rail Shipment.
3.
Remove locking pin (Figure 2, Item 3) from reinforcement plate (Figure 2, Item 4).
4.
Remove transport pin (Figure 2, Item 1) from clip (Figure 2, Item 11) and bracket (Figure 2, Item 10).
5.
Insert transport pin (Figure 2, Item 1) through hole (Figure 2, Item 2) in reinforcement plate (Figure 2, Item 4),
hole (Figure 2, Item 9) in flatrack (Figure 2, Item 5), and hole (not shown) in trailer rail (Figure 2, Item 7).
6.
Insert locking pin (Figure 2, Item 3) through two tabs on reinforcement plate (Figure 2, Item 4) to secure
transport pin (Figure 2, Item 1).
7.
Repeat Steps (1) through (6) for remaining transport pin (Figure 2, Item 1).
END OF TASK
TM 9-2330-342-23&P
0123
0123-2