MARKING
Refer to AR 746-1
(WP
0190)for Marking of Supplies for Shipment.
END OF TASK
PREPARATION AFTER RAIL SHIPMENT
1.
Remove locking pin (Figure 3, Item 4) from reinforcement plate (Figure 3, Item 5).
1
2
3
4
5
6
7
9
10
11
13
12
8
Figure 3.
Preparation After Rail Shipment.
2.
Remove transport pin (Figure 3, Item 1) from hole (Figure 3, Item 11) in flatrack (Figure 3, Item 6), hole (Figure
3, Item 2) in reinforcement plate (Figure 3, Item 5), and hole (not shown) in trailer rail (Figure 3, Item 9).
3.
Install transport pin (Figure 3, Item 1) on bracket (Figure 3, Item 12) and clip (Figure 3, Item 13).
4.
Remove reinforcement plate (Figure 3, Item 5) from holes (Figure 3, Item 10) in trailer chassis (Figure 3, Item
8).
5.
Install reinforcement plate (Figure 3, Item 5) on studs (Figure 3, Item 7) with two locknuts (Figure 3, Item 3).
6.
Install locking pin (Figure 3, Item 4) on reinforcement plate (Figure 3, Item 5).
7.
Repeat Steps (1) through (6) for remaining transport pin (Figure 3, Item 1).
END OF TASK
FOLLOW-ON MAINTENANCE
Remove wheels chocks (TM 9-2330-342-10). (WP
0190)
END OF TASK
END OF WORK PACKAGE
TM 9-2330-342-23&P
0123
0123-3/4 blank