TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 991 of 1348

FIELD MAINTENANCE
RAIL SHIPPING INSTRUCTIONS
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP
0194, Table 1, Item 47)
Materials/Parts
Locknut Qty:
4 (WP
0195, Table 1, Item 9)
References
AR 746-1 (WP
0190)
Fig. 47 (WP
0182)
Equipment Condition
Wheels chocked (TM 9-2330-342-10). (WP
0190)
Flatrack locked to trailer (TM 9-2330-342-10).
(WP
0190)
PREPARATION PRIOR TO RAIL SHIPMENT
WARNING
Rail-load locking pins must be installed to lock flatrack to trailer for rail transport. Failure to
comply may result in injury or death to personnel.
NOTE
Right and left rail-load locking pins are installed the same way.
Refer to Load Handling System and ensure that the flatrack rollers are against the
stops at rear of trailer. This will help to align the holes in the trailer and flatrack.
1.
Remove two locknuts (Figure 1, Item 3) and reinforcement plate (Figure 1, Item 1) from studs (Figure 1, Item
2). Discard locknuts.
TM 9-2330-342-23&P
0123
0123-1


Back to Top