FIELD MAINTENANCE
TRAILER PREPARATION FOR LIFTING
INITIAL SETUP:
Tools and Special Tools
Strap, Tiedown (TM 9-2330-342-10) (WP
0190)
Equipment Condition
Flatracks removed (TM 9-2330-342-10).
(WP
0190)
Cart stowed for EMM operation (TM
9-2330-342-10). (WP
0190)
Parking brakes applied (TM 9-2330-342-10).
(WP
0190)
Equipment Condition (cont.)
Wheels chocked (TM 9-2330-342-10). (WP
0190)
Drawbar retracted (TM 9-2330-342-10).
(WP
0190)
Air systems charged with air (TM 9-2330-342-10).
(WP
0190)
Turntable pinned (TM 9-2330-342-10). (WP
0190)
PREPARATION FOR LIFTING
1.
Move air assist lever (Figure 1, Item 3) on trailer (Figure 1, Item 2) to RAISE position and raise drawbar (Figure
1, Item 4) to highest position. Return air assist lever (Figure 1, Item 3) to NEUTRAL position.
3
2
4
5
6
1
Figure 1.
Trailer Preparation For Lifting.
2.
Route tiedown strap (Figure 1, Item 5) through front bumper (Figure 1, Item 1) of trailer (Figure 1, Item 2) and
attach ends of tiedown strap (Figure 1, Item 5) to rings (Figure 1, Item 6) on drawbar (Figure 1, Item 4). Tighten
tiedown strap securely.
END OF TASK
PREPARATION AFTER LIFTING
1.
Charge air system (TM 9-2330-342-10) (WP
0190).