TM 9-2330-356-14
Figure 5-2. Upper and Lower Torque Rods (M967, M969, and M970 except M970
-
SN TC-0843, TC-0844, and TC-103 thru TC-178).
5-12.
M970 except M970 SN TC-0843, TC-0844, and TC-
positioned as close as possible to the lower torque rod
103 thru T-178).
brackets on the axles.
a.
Removal
(FIgs. 5-3
and 5-4).
(3)
Position a jack under the torque rod bracket
(1) Position semitrailer on hard level surface with
on the trunnion cross tube. Jack up the trunnion cross tube
front resting on landing gear.
until the weight of the vehicle is removed from the spring
to be removed, Put supports or cribbing under the rear
(2) Jack Up the front and rear axles on the side
where the spring is to be removed until wheels arc
approximately l-inch off the ground. The jacks should be
(4) Remove wheels from both axles (para 4-49).
corners of the semitrailer frame.
Change 3
5-15