TM 9-2330-356-14
(14) Stop engine (para 2-10d).
(15) Drain accumulated water (para 2-13d).
(16) Remove grounding wires.
(17) Store and cover fire extinguishers.
b.
Bulk Delivery (All Models).
To pump fuel from the
semitrailer to the storage facility (fig. 2-27), use the
following procedure:
(1) Review instructions in paragraph 2-8.
(2) Ensure that all valves are closed.
(3) Connect grounding wire to storage facility
and grounding stud on top of semitrailer (fig. 2-7).
Remove fire extinguishers and bring them to the point of
operation.
(4) Start engine (para 2-10). When engine is
warm, adjust throttle to idle speed (1000-1200 rpm).
(5) Remove 4-inch bulk fuel hose from trough
(para 2-13c).
(6) Remove dust cover from outlet B (fig. 2-11 or
2-12), and connect fuel hose to outlet and storage facility.
(7) Put valve E in UNLOAD position (M967,
M967A1, M969, and M969A1).
(8) Ensure that valve E is in closed position on
M970 and M970A1.
(9) Open valves A (para 2-11f), B, F, and H.
(10) Adjust engine throttle for desired flow rate
(table 2-2).
(11) Idle down engine at end of operation. Close
all valves, disconnect hose (s), and reinstall dust cover.
(12) Put bulk fuel hoses in hose trough and secure
latches.
(13) Stop engine (para 2-10d).
(14) Drain accumulated water (para 2-13d).
(15) Remove grounding wire.
(16) Store and cover fire extinguishers.
Figure 2-27. Typical Bulk Delivery Flow Diagram (M967 and M967A1 Arrangement Shown).
2-29