TM 9-2350-238-20-1
2
Install gasket (2) on receptacle connector (3).
3
Install receptacle connector (3) with gasket (2), four washers (4), and four socket head
capscrews (5) on bulkhead.
4
Connect plug connector (6) to receptacle connector (3).
5
Untag and connect shell connector (7) to line connection.
6
Untag and connect shell connector (8) to line connection.
7
Untag and connect shell connector (9) to line connection.
8
Untag and connect shell connector (10) to rectifier (11).
9
Untag and connect shell connector (12) to rectifier (11).
10
Untag and connect shell connector (13) to 15 AMP
11
Untag and connect shell connector (15) to 20 AMP
12
Untag and connect shell connector (17) to 15 AMP
13
Untag and connect shell connector (19) to 15 AMP
14
Wiring harnesses and leads are secured to the hull
circuit breaker (14).
circuit breaker (16).
circuit breaker (18).
circuit breaker (20).
and components with loop clamps, straps,
clips, ground screws, etc. During installation, make sure the wiring harness or Iead is secure
and all hardware is tight.
2-685