TM 9-2350-238-34-2
2-20. MAINTENANCE OF WINCH LEVEL WIND AND CONNECTING LINK SLIDE
(CONT).
REASSEMBLY (CONT)
11 Install remote control lever (26), sleeve
16 Install rigid connecting link (38) and
spacer (27), helical spring (28), and
thrust washer bearing (29) to shaft of
cable guide (19).
12 Install flat washer (30) and new self-
Iocking nut {31) to shaft of cable guide
(19).
13
Install quick release pin (32), chain
assemblv (33), new Iockwasher (34),
secure with quick release pin (32) to
level wind housing (2).
17 Install hub slide clamp (39), hexagon
head capscrew (40), new Iockwasher
(41), and nut (42) to level wind housing
(2).
18 If removed, install three instruction
dates (43) to level wind access cover
and machine screw (35) to cross weld-
(44) with 12 new drive screws (45); four
ment bar (36).
drive screws in each plate.
14 If removed, install two sleeve bearings
19
Install level wind access cover (44),
(37) to cross weldment bar (36).
three flat washers (46), and three
machine bolts (47).
15 Apply a thin coat of grease (item 9, appx
B) to the bearing surfaces of the rigid
connecting link (38).
2-26