TM-9-2350-260-20-1-2

TANK, COMBAT, FULL TRACKED 105-MM GUN, M60 2350-00-678-5773 (HULL)

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE VOLUME 2 OF 4, CHAPTERS 5 THRU 9

  TM-9-2350-260-20-1-2 - Page 593 of 772

TM 9-2350-260-20-1-2
MANIFOLD HEATER OPERATIONAL CHECK (Sheet 1 of 2)
SPECIAL TOOLS:
Ground hop kit (Item 30, Chapter 3, Section I)
PERSONNEL:
Two
PRELIMINARY PROCEDURE:
Remove powerplant (page 5-1)
OPERATIONAL CHECK:
NOTE
This procedure applies to manifold heaters on both 2A and 2D powerplants.
Make
this check after any part of manifold heater system
is replaced.
It requires two
persons to complete.
1.
Prepare engine for powerplant test run (page 5-4).
2.
Station one person on side of engine that maintenance was performed, with one hand on intake manifold heater
tube (A).
Go on to Sheet 2
TA148399
7-324


Back to Top