TM-9-2350-260-20-1-3

TANK, COMBAT, FULL TRACKED 105-MM GUN, M60 2350-00-678-5773 (HULL)

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE VOLUME 3 OF 4 CHAPTERS 10 THRU 15

  TM-9-2350-260-20-1-3 - Page 36 of 783

TM 9-2350-260-20-1-3
VOLTAGE REGULATOR ASSEMBLY REPLACEMENT (Sheet 3 of 3)
INSTALLATION:
1.
Using 7/16 inch wrench, install screw (A) and new
lockwasher (B) securing one end of ground lead (C)
to terminal (D) on hull.
2.
Using hands, position bracket (E) in tank.
3.
Using 7/16 inch wrench, install three clamps (F) and
four screws and new lockwashers (G).
4.
Using hands, position voltage regulator (H) in
bracket (E).
5.
Using 3/8 inch socket and extension, tighten three
screws (J).
6.
Using 3/8 inch wrench, tighten screw (K).
7.
Using spanner wrench, install connectors (L) and
(M) to voltage regulator (H).
8.
Using 5/16 inch wrench, install screw (N), small star washer (P), ground lead (C), and large star washer (Q) to voltage
regulator (H).
9.
Close turret platform access cover (TM 9-2350-260-10).
10. Adjust generator voltage (page 10-25).
End of Task
TA147056
10-24


Back to Top