TM 9-2350-261-20-2
REPLACE DOME LIGHT CIRCUIT BREAKER (M577A2 AND M1068 ONLY) — Continued
0280 00
INSTALLATION
1.
Place circuit breaker (7) in master switch panel (4). Secure with two screws (9) and nuts (8).
2.
Connect two circuit 10 leads (6) to circuit breaker (7).
3.
Place master switch panel (4) on distribution box (5). Secure with eight screws (3), washers (2), and new locknuts (1).
FOLLOW-THROUGH STEPS
1.
Connect battery ground lead (WP 0294 00).
2.
Turn MASTER SWITCH to ON (see your -10).
3.
Operate dome lights to check that circuit breaker is operable (see your -10).
4.
Turn all switches OFF (see your -10).
END OF TASK
0280 00-2