TM 9-2350-261-20-2
REPLACE STEERING LEVERS CROSS-SHAFT LINKS — Continued
0391 00
CLEAN, INSPECT, AND REPLACE
1.
Check links. Replace links with cracks, breaks, or stripped threads.
2.
Check link clevises. Replace link clevises with cracks or worn mounting holes.
3.
Check clevis pins. Replace worn or grooved clevis pins.
4.
Check stop light tangs. Replace links with cracked or broken tangs.
INSTALLATION
1.
Install two links (1) on steering levers and differential cross-shafts. Secure with four clevis pins (2) and four new cotter
pins (3).
2.
Adjust linkage (WP 0387 00).
3.
Adjust stoplight switch (WP 0290 00).
4.
Connect two return springs (WP 0387 00).
5.
Install cross-shaft covers on power plant compartment bulkhead (WP 0390 00).
FOLLOW-THROUGH STEPS
1.
Install oil can bracket (WP 0524 00).
2.
Install air cleaner housing and element (WP 0185 00).
3.
Install driver’s power plant access panel (WP 0430 00).
4.
Close power plant front access door and raise trim vane (see your -10).
5.
Operate carrier (see your -10). Check that steering operates properly.
END OF TASK
0391 00-2