TM-9-2350-261-20-2

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 2 OF 4

  TM-9-2350-261-20-2 - Page 810 of 1008

TM 9-2350-261-20-2
REPLACE STEERING LEVERS CROSS-SHAFTS AND BEARINGS — Continued
0390 00
INSTALLATION
NOTE
If arm bearing (1) is to be replaced, use shim (2) as a template to locate and drill two .250-.252
inch (6 mm) holes in base of new bearing before installation. If there is no shim, make template
from old bearing.
1.
Assemble cross-shaft (3), cross-shaft (4), arm bearing (1), lube fittings (5), and two thrust washers (6) as a unit. Install
through power plant compartment bulkhead opening.
2.
Place shim (2) and bearing (1) on bracket (7). Secure with two new tapered pins (8), new locknuts (9), washers (10), and
screws (11).
3.
Install two clevises (12) on cross-shaft (3) and cross-shaft (4). Secure with two clevis pins (13), washers (14) and
new cotter pins (15).
4.
Install new gasket (16), cover (17), and cover (18) on five press nuts (19) in power plant compartment bulkhead. Secure
with five new locknuts (20), screws (21), and washers (22).
5.
Install bearing (23) in bracket (24). Secure with two retaining rings (25). Use snap ring pliers.
6.
Install two quadrants (26) and stops (27) on bracket (24). Secure with two screws (28) and new locknuts (29).
0390 00-4


Back to Top