TM-9-2350-261-20-2

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 2 OF 4

  TM-9-2350-261-20-2 - Page 819 of 1008

TM 9-2350-261-20-2
REPLACE DIFFERENTIAL CROSS-SHAFTS AND BEARINGS — Continued
0392 00
11. Lubricate bearing (WP 0120 00).
12. Connect two return springs (WP 0387 00).
FOLLOW-THROUGH STEPS
1.
Install oil can bracket (WP 0524 00).
2.
Install air cleaner housing and element (WP 0185 00).
3.
Close power plant front access door and raise trim vane (see your -10).
4.
Operate carrier (see your -10). Check that differential cross-shafts and bearings operate properly.
END OF TASK
0392 00-5/6 blank


Back to Top