TM 9-2350-311-34-2
9 Deleted.
10
Install new preformed packing (34).
NOTE
Lubricate threads of four cap screws with clean lubricating oil before installation.
11
Install mount assembly (33) to power pack reservoir (24) using four new lockwashers (32) and four cap
screws (31). Torque cap screws to 20-25 lb-ft (27-34 N•m).
Change 2 6-9