TM-9-2520-215-34

CROSS-DRIVE TRANSMISSION ASSEMBLY

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

DECEMBER 2005

  TM-9-2520-215-34 - Page 301 of 508

TM 9--2520--215--34
0059 00--1
TORQUE CONVERTER LOCKUP CLUTCH ASSEMBLY AND RELATED PARTS
REPLACEMENT
0059 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Tools and Special Tools
General mechanic’s tool kit (item 1, WP 0088 00)
Lifting sling (item 13, WP 0088 00)
Torque wrench (item 22, WP 0088 00)
Pin (item 7, WP 0088 00)
Hoist (5000 lb lifting capacity min)
Materials/Parts
Lumber (item 6, WP 0085 00)
Equipment Conditions
Torque converter input pressure pump removed
(WP 0057 00)
REMOVAL
1. Remove pipe plug (1) for access to converter assembly bolts.


Back to Top