TM 9-2520-270-34
21. INSTALL VALVE (1) IN ACCESS
COVER (2).
a.
b.
c.
d.
Position gasket (3) on valve (1).
Position valve (1) in access
cover (2).
Install washer (4) and nut (5) on
valve (1).
Using 1-inch ratchet handle and
2 1/4-inch socket, tighten nut (5)
on valve (1).
22. INSTALL PRESSURE EQUALIZING
VALVE (6) IN UPPER
CONTAINER (7).
a. Place new packing (8) on valve (6).
b. Install valve (6) in dessicant
port (9) of upper container (7).
c. Install wire rope (10) into eyelet (11)
of retainer (12).
d. Install screw (13) and lock washer (14)
in retainer (12).
4-534
Change 1