TM-9-2990-205-34-P

TURBOSUPERCHARGER MODEL 5HDR

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

SEPTEMBER 2005

  TM-9-2990-205-34-P - Page 68 of 128

TM 9--2990--205--34&P
0012 00--6
ASSEMBLY AND OPERATIONAL TESTING -- CONTINUED
0012 00
5. Installation of Oil Deflector, Flinger Sleeve with Metal Seal Rings and Preformed Packing.
a. Install oil deflector (1) and align screw holes.
b. Install three new oil deflector screws (2). Torque screws to 55 to 65 lb--in (6.215 to 7.345 N
S
m).
03i491m
2
1
2
c.
Install new flinger sleeve (3) with two new metal seal rings (4).
d. Install new preformed packing (5) in bearing housing groove.
03i492m
3
4
5


Back to Top