TB-9-2350-277-40-P-4

CARRIER, COMMAND POST, FULL-TRACKED, ARMORED, M577A3; STANDARD INTEGRATED COMMAND POST SYSTEM (SICPS), M1068A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 4 OF 4

JUNE 2009

  TB-9-2350-277-40-P-4 - Page 30 of 100

TB 9-2350-277-40&P-4
MODIFICATION PROCEDURES – Continued
0004 00
0004 00-2
WARNING
Metal chips and grinding dust can cause eye injury.
Wear goggles
and gloves.
1.
Remove existing strap fastener loops (1) and (2) from top rear of hull roof.
Grind welds flush and
smooth.
Figure 1.
CREW II Primary Unit Clearance Provision
2.
Paint each area to prevent corrosion. Reference TM 43-0139.


Back to Top