TB-9-2350-277-40-P-4

CARRIER, COMMAND POST, FULL-TRACKED, ARMORED, M577A3; STANDARD INTEGRATED COMMAND POST SYSTEM (SICPS), M1068A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 4 OF 4

JUNE 2009

  TB-9-2350-277-40-P-4 - Page 35 of 100

TB 9-2350-277-40&P-4
MODIFICATION PROCEDURES – Continued
0004 00
0004 00-7
DRILL CREW II HULL ROOF RCU AND GPS CABLE CLAMP
NOTE
To protect hull integrity, do not break thru hull when drilling.
Marking
the drill for a maximum depth of 5/8 inch will prevent any break thru.
1.
Locate and mark for hole (13), measuring from right inside hull edge (12) and from front hull edge
(14) above engine bulkhead.
2.
Drill a hole (13) using a 3/16 inch drill bit to a maximum depth of 5/8 inch.
DO NOT BREAK
THRU.
3.
Tap hole (13) using a 10-24 tap.
Tap hole to a minimum depth of 1/2 inch.
Figure 6. Location for CREW II Hull Roof RCU and GPS Cable Clamp
4.
Paint drilled area to prevent corrosion. Reference TM 43-0139.


Back to Top