TB-9-2350-277-40-P-4

CARRIER, COMMAND POST, FULL-TRACKED, ARMORED, M577A3; STANDARD INTEGRATED COMMAND POST SYSTEM (SICPS), M1068A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 4 OF 4

JUNE 2009

  TB-9-2350-277-40-P-4 - Page 36 of 100

TB 9-2350-277-40&P-4
MODIFICATION PROCEDURES – Continued
0004 00
0004 00-8
DRILL CREW II RIGHT RAIL SUPPORT BRACKET RCU AND GPS CABLE CLAMPS
NOTE
Drill thru support brackets.
1.
Locate and mark three holes (15) on right rail support brackets, measuring 1-1/2 inches down
from inside hull roof (16) on each support bracket (17).
2.
Drill a hole (15), using a 1/4 inch drill bit, thru each of the three support brackets (17).
Figure 7.
Location for CREW II Right Rail Support Bracket RCU and GPS Cable Clamps
3.
Paint drilled area to prevent corrosion. Reference TM 43-0139.
END OF WORK PACKAGE


Back to Top