TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 47 of 704

0007-1
Change 1
TB 9-3950-253-13&P
0007
OPERATOR MAINTENANCE
-
UNLOADING AND LOADING EMPTY LIFT FRAME
Retrieve Lift Frame, Unload with Empty Lift Frame, Place Lift Frame on Ground, Pick up Lift Frame from
Ground, Load with Empty Lift Frame, Stow Lift Frame
WARNING
Use extreme caution while loading/unloading lift frame. Check for overhead wires or
cables and verify adequate clearance to complete operation. Failure to follow this warning
may result in damage to equipment and injury or death to personnel.
INITIAL SETUP
References
0
WP 0006
0
WP 0008
0
Equipment Conditions
0
Hook arm in home position (PLS: TM 9-2320-
364-14&P, HEMTT: TM 9-2320-326-14&P)
0
Slider beds in container configuration
(WP 0006)
0
Equipment Conditions - Continued
0
MODE switch set to OFF position (PLS: TM 9-
2320-364-14&P, HEMTT: TM 9-2320-326-
14&P)
0
Stowage switch set to OFF position
(WP 0004)
0
NO TRANS light off (PLS: TM 9-2320-364-
14&P, HEMTT: TM 9-2320-326-14&P)
0
32


Back to Top