TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 49 of 704

0007-3
Change 1
TB 9-3950-253-13&P
0007
RETRIEVE LIFT FRAME – CONTINUED
Retrieve Lift Frame - Stage 1 – Continued
0007
5. Press and hold UP button (Figure 2, Item 1) until hook arm frame rises by approximately 4 in. (10 cm) and
stops. Release UP button.
Figure 2.
Frame Retrieval/Stowage Position.
07
467-168
1


Back to Top