TM 9-1240-401-34&P
5.1-7. GENERAL SUPPORT INITIAL INSPECTION
Item No.
Item To Be Inspected
1
2
3
4
M15 QUADRANT
MOUNTING SURFACE
COUNTER AND LEVEL VIAL
LEDS
ELEVATION KNOB AND
ELEVATION MECHANISM
Procedures
NOTE
The following inspections should be performed with the M15
quadrant mounted on cross-leveling fixture
. Refer to final
inspection (ref. para 5.1-24) for setup and mounting procedures.
Check that all parts are in proper positions and securely attached.
Check that mounting surface is properly alined and free of burrs and
corrosion.
Apply 24 volts DC to quadrant housing connector receptacle. Check
that LEDs illuminate counters and level vials sufficiently to enable
easy reading in a darkened area when toggle switch is moved to
correct position.
a.
Check that torque required to turn elevation knob in either
direction does not exceed 8 pound-inches (0.904 N-m) at any
point between stops.
5.1-6
Change 1