TM 9-1240-401-34&P
6-9
a. SETTING UP INSPECTION FIXTURE
1
2
3
4
5
6
7
8
9
10
11
Place inspection fixture (1) on a clean level surface
at a height suitable for comfortable viewing through
collimating projector and collimating telescope.
Mount reflecting mirrors (2) on inspection fixture
(l), making sure that all mating surfaces are free of
dirt, burrs, and other defects which would interfere
with proper seating.
Insert special test reticle 8599932-15 into collimat-
ing projector (3).
Install collimating projector (3) in collimator holding
fixture (4) with vertical reticle line approximately
vertical.
Insert special test reticle 8599932-14 into auxiliary
telescope (5).
Install auxiliary telescope (5) in support (6) with
vertical reticle line approximately vertical.
Mount collimating telescope (7) in collimating tele-
scope holder (8) on surface gage.
Adjust height of collimating telescope (7) to height
of auxiliary telescope (5) on inspection fixture (1).
Suspend a plumbline approximately 10 feet
(3.05m) from collimating telescope (7) viewing
point.
View plumbline through collimating telescope (7)
and revolve collimating telescope (7) until vertical
reticle line is in coincidence with plumbline image.
Secure collimating telescope (7) in collimating tele-
scope holder (8) to maintain the trueness of the
vertical reticle line.
Place collimating telescope (7) in line with auxiliary
telescope (5).