INSTALLATION - Continued
19.
Install transmission shift cable (Figure 17, Item 8) on shift lever (Figure 17, Item 13) with cotter pin
(Figure
17,
Item 12).
20.
Install transmission shift cable (Figure 17, Item 8) on transmission adapter plate (Figure 17, Item 11) with
spacer (Figure 17, Item 9), u-bolt (Figure 17, Item 10), and two nuts (Figure 17, Item 7).
21.
Connect two leads (Figure 17, Item 14) to neutral safety switch wires (Figure 17, Item 15).
22.
Connect lead (Figure 17, Item 18) to solenoid connector (Figure 17, Item 17).
23.
Install modulator cable (Figure 17, Item 6), clamp (Figure 17, Item 4), and ground wire (Figure 17, Item 3) on
bracket (Figure 17, Item 16) with screw (Figure 17, Item 5), lockwasher (Figure 17, Item 2), and nut
(Figure
17, Item
1).
24.
Connect lead (Figure 17, Item 20) to transmission temperature sending unit (Figure 17, Item 19).
NOTE
Wrap all male pipe threads with antiseize tape before installation.
25.
Install breather vent tube (Figure 17, Item 21) on elbow (Figure 17, Item 22).
TM 9-2320-272-23-2
0213
0213-24