TM 9-2320-328-13&P-1
0057-25
DRAFT
0057
Change 1
.
HWT0936
.
Step 35.
With a test lead set, check for continuity across cab power distribution wire harness wire
2830 (red) from relay 9 connector, terminal 1 to relay 9 connector, terminal 5.
.
a.
If there is continuity, replace relay 9 (WP 0244).
.
b.
If there is no continuity, replace cab power distribution wire harness
and block (WP 0280).
.
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION