TM-9-2320-328-13-P-1

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 1 OF 3

MARCH 2009

  TM-9-2320-328-13-P-1 - Page 405 of 1318

TM 9-2320-328-13&P-1
0057-25
DRAFT
0057
Change 1
.
HWT0936
.
Step 35.
With a test lead set, check for continuity across cab power distribution wire harness wire
2830 (red) from relay 9 connector, terminal 1 to relay 9 connector, terminal 5.
.
a.
If there is continuity, replace relay 9 (WP 0244).
.
b.
If there is no continuity, replace cab power distribution wire harness
and block (WP 0280).
.
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION


Back to Top