CONTINUITY TEST
NOTE
Change 2
2-2005
(1) Remove circuit breaker CB6 from Power
Distribution Panel (PD1).
(2) Set multimeter to ohms.
(3) Connect positive (+) probe of multimeter to
one terminal of circuit breaker CB6.
(4) Connect negative (-) probe of multimeter to
other probe of circuit breaker CB6 and note
reading on multimeter.
(5) If continuity is not present, replace circuit
breaker CB6 (para 20-87).
(6) If continuity is present, perform Special
Purpose Kit Troubleshooting task u1. No
Power to Digitization Rack.
Perform steps (7) through (10), if continuity
is present through circuit breaker CB6.
(7) Install circuit breaker CB6 in Power
Distribution Panel (PD1)
(8) Position electrical distribution block cover on
power distribution shelf.
(9) Tighten wing nut on electrical distribution
block cover.
(10) Install wing screw on power distribution shelf.
TM 9-2320-365-20-2