TM-9-2330-202-13-P

TRAILER, CARGO, 3/4-TON, 2-WHEEL: M101A1, M101A2 AND M101A3; TRAILER, CHASSIS, 3/4-TON, 2-WHEEL: M116A1 AND M116A2; TRAILER, CHASSIS, 1-TON, 2-WHEEL: M116A3

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

DECEMBER 2011

  TM-9-2330-202-13-P - Page 191 of 552

INSTALLATION - Continued
6.
At junction box (Figure 2, Item 4) at roadside drawbar (Figure 2, Item 5), connect chassis wiring harness
connectors (Figure 2, Item 2) to intervehicular cable connectors (Figure 2, Item 6). Place connectors
(Figure 2, Items 2 and 6) in clips (Figure 2, Item 3).
7.
Install cover (Figure 2, Item 18) on roadside drawbar (Figure 2, Item 5) with four new lockwashers
(Figure 2, Item 19) and screws (Figure 2, Item 20).
1
1
1
1
1
1
2
3
3
4
5
6
7
8
9
10
10
11
12
13
14
15
16
17
18
19
20
M116_M101_062a
Figure 2.
Chassis Wiring Harness Replacement.
END OF TASK
FOLLOW ON TASK
Connect intervehicular cable to prime mover (WP
0005).
END OF TASK
END OF WORK PACKAGE
TM 9-2330-202-13&P
0040
0040-3/4 blank


Back to Top