TM-9-2330-227-14-P

SEMITRAILER, VAN: SHOP, 6-TON, SINGLE AXLE, M146

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

JUNE 1985

  TM-9-2330-227-14-P - Page 139 of 576

TM 9-2330-227-14&P
CLEARANCE LIGHT ASSEMBLY - CONTINUED
INSTALLATION - CONTINUED
FOLLOW-ON
NOT E
MAINTENANCE: Check operation of lights (page 2-22).
TASK ENDS HERE
INSIDE DOMELIGHT, 24-VOLT
This task covers:
a. Removal (page 4-62)
c. Installation (page 4-66)
b. Repair (page 4-62)
INITIAL SETUP
Tools
Personnel Required
Pliers, long round-nose
One
Screwdriver, cross-tip, number two
Screwdriver, flat-tip, 3/16-inch
Wrench, box-end, 7/16-inch
Wrench, box-end, 7/8-inch
ACTION
LOCATION
ITEM
REMARKS
NOT E
All 24-volt inside domelights are removed, repaired, and installed the same way. This
task is for one; repeat for the others.
If circuit marker bands are missing or not readable, replace (page 4-73).
4-61


Back to Top