TM 9-2330-227-14&P
SUBFRAME AND SUSPENSION ASSEMBLY (BOGIE) - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
6.
7.
8.
9.
Two blocks (6),
blocks (8), and
weld nuts (9)
10.
11.
Two remaining blocks
(6), blocks (8), and
weld nuts (9)
12.
Four blocks (6)
13.
Four plates (2)
Semitrailer
lifting eyes (1)
Bogie
assembly (11)
Semitrailer
Two master
pins (10)
Semitrailer
Two remaining
master pins (10)
Four plates (2)
Four nuts (3),
Iockwashers (4),
and washers (5)
a.
b.
c.
a.
b.
Attach chains from overhead hoist
to lifting eyes.
Lift semitrailer off cribbing.
Remove cribbing.
Support with dolly jack, and roll
under semitrailer body.
Position under semitrailer using
blocks as required.
Using overhead hoist, lower semitrailer,
but do not allow full weight to rest on
bogie assembly (11).
Move bogie assembly (11) until master
pins (10) can be screwed in.
Using overhead hoist, lower completely
onto bogie assembly (11).
Screw in, and tighten all four pins (10)
using 11/2-inch socket and ratchet
handle with 3/4-inch drive.
Place in position.
Screw on, and tighten using 3/4-inch
socket and ratchet handle with
3/4-inch drive.
5-35