TM-9-2330-227-14-P

SEMITRAILER, VAN: SHOP, 6-TON, SINGLE AXLE, M146

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

JUNE 1985

  TM-9-2330-227-14-P - Page 308 of 576

TM 9-2330-227-14&P
SUBFRAME AND SUSPENSION ASSEMBLY (BOGIE) - CONTINUED
INITIAL SETUP
Tools
Personnel Required
Blocks, wood
Two
Handle, ratchet, 3/4-inch drive
Hoist, overhead, 10-ton capacity
Equipment Condition
Jack, dolly, hydraulic, 8-ton
capacity
Air reservoir drained (page 2-13).
Socket, 3/4-inch drive, 3/4-inch
Brake air iine couplings disconnected
Socket, 3/4-inch drive, 11/2-inch
(page 2-25).
Splash guards removed (page 4-155).
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1.
2.
3.
4.
5.
5-34
Rear of
Two lifting
a. Using overhead hoist and chains,
semitrailer
eyes (1)
attach chains to lifting eyes.
b. Take up slack.
Plate (2)
Nut (3),
Using 3/4-inch socket and ratchet handle
Iockwasher (4),
with 3/4-inch drive, unscrew and take
and washer (5)
off.
Block (6)
Plate (2)
Press retaining spring (7) to release
plate (2) and take off.
Block (6),
Four master
a.
block (8), and
pins (10)
weld nut (9)
b.
Using 11/2-inch socket and ratchet
handle with 3/4-inch drive, unscrew
and take out.
Leave master pin in place if it
does not drop out.
Repeat steps 2 through 4 at the other
three bogie mounting points.
WARNIN G
As semitrailer body is lifted, the bogie assembly will tend to tip either forward or
backward. Be ready with dolly jacks and blocking to prevent unwanted movement.
Failure to heed this warning could result in personnel injury.
Semitrailer
a.
and bogie
assembly (11)
b.
c.
Using overhead hoist, lift until semi-
trailer body is free of bogie.
Roll out from under semitrailer body.
Support semitrailer body with cribbing.


Back to Top