TM 9-2330-335-14&P
0025-2
0025
REMOVAL
00025
1.
Disconnect two connectors.
2.
Remove two nuts (Figure 1, Item 3), lockwashers (Figure 1, Item 2), and blackout light (Figure 1, Item 1).
Discard lockwashers.
Figure 1.
Blackout Lights.
025
END OF TASK
INSTALLATION
00025
1.
Install blackout light (Figure 1, Item 1), two new lockwashers (Figure 1, Item 2), and nuts (Figure 1, Item 3).
2.
Apply dielectric grease on pins and then connect two connectors.
END OF TASK
FOLLOW-ON TASKS
00025
1.
Connect semitrailer to prime mover.
2.
Raise landing legs.
3.
Remove/store chocks and ground boards.
4.
Connect power source and test blackout lights for proper operation.
END OF TASK
END OF WORK PACKAGE
447-0052