0029-3/(4 blank)
TM 9-2330-335-14&P
0029
REMOVAL - CONTINUED
5.
Remove cable (Figure 3, Item 5) from receptacle converter box (Figure 3, Item 9).
6.
Remove four locknuts (Figure 3, Item 10), bolts (Figure 3, Item 11), and receptacle converter box (Figure 3, Item 9) from
nose plate (Figure 3, Item 2). Discard locknuts.
Figure 3.
Receptacle Converter Box and Cable.
029
END OF TASK
INSTALLATION
00029
1.
Install receptacle converter box (Figure 3, Item 9), four bolts (Figure 3, Item 11), and new locknuts (Figure 3,
Item 10) on nose plate (Figure 3, Item 2).
2.
Install cable (Figure 3, Item 5) on receptacle converter box (Figure 3, Item 9).
3.
Connect cable (Figure 2, Item 5) to wiring harness (Figure 2, Item 4).
4.
Connect hoses (Figure 2, Items 7 and 3) if disconnected.
5.
Connect ground wire (Figure 2, Item 6) and install nut (Figure 2, Item 8).
6.
Install nose plate (Figure 1, Item 2) as a unit and install six new self-tapping screws (Figure 1, Item 1).
END OF TASK
FOLLOW-ON TASKS
00029
1.
Connect semitrailer to prime mover.
2.
Raise landing legs.
3.
Remove/store chocks and ground boards.
4.
Connect power source and test receptacle converter box for proper operation.
END OF TASK
END OF WORK PACKAGE
447-0003