TM-9-2350-260-20-1-2

TANK, COMBAT, FULL TRACKED 105-MM GUN, M60 2350-00-678-5773 (HULL)

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE VOLUME 2 OF 4, CHAPTERS 5 THRU 9

  TM-9-2350-260-20-1-2 - Page 204 of 772

TM 9-2350-260-20-1-2
ENGINE OIL COOLER REPLACEMENT (2A ENGINE) (Sheet 8 of 8)
15.
Position two new gaskets (S) on engine oil cooler
(C).
16.
Remove tape and plastic and position engine oil
cooler connectors (T) and (U) on oil cooler (C).
17.
Using 1/2 inch socket, install six new self-locking
nub (V) securing two engine oil connectors (T) and
(U) to engine oil cooler (C).
18.
Remove masking tape and plastic from hoses (W)
and (X).
19.
Using 1-1/2 inch wrench, install hose nut (W) to
connector (U).
20.
Using 1-1/2 inch wrench, install hose nut (X) to
connector (T).
22.
Replenish lubricating oil lot during engine oil cools
replacement (LO 9-2350-260-12).
Start and run
engine.
23.
Ground hop engine (page 5-54).
Check for oil
leaks at oil cooler and hose connections.
Tighten
any connections that are leaking.
24.
Stop engine and disconnect ground hop kit (page 67).
25.
Install powerplant (page 5-14).
End of Task
TA147578
6-127


Back to Top