TM 9-2350-260-20-1-2
ENGINE OIL COOLER REPLACEMENT (2D ENGINE) (Sheet 6 of 6)
16.
Using 3/4 inch socket, tighten valve (L).
17.
Install new washer on screw (M).
18.
Using 1/2 inch socket, install washer and screw
(M).
19.
Check engine oil level indicator gage rod (TM
9-2350-260-10).
20.
Replenish lubricating oil lost during oil cooler
replacement (LO 9-2350-260-1-2).
21.
Connect engine for powerplant ground hop (page
5-54).
22.
Start and run engine.
Check for oil leaks at oil
cooler and hose connections.
23.
Shut down engine.
Disconnect engine from
powerplant ground hop kit (page 5-67).
24.
Install engine shroud (page 9-3).
25.
Install powerplant (page 5-40).
End of Task
TA147584
6-133