REPLACE REAR MAIN WIRING HARNESS (M113A2, M901A1, AND
M1059 ONLY ) — Continued
INSTALLATION
1.
Install rear main wiring harness in carrier.
2.
Connect circuit 24 lead (23), circuit 23 lead (22), circuit 22 lead (21), and circuit 21 lead (20) to front main wiring
harness.
3.
Connect circuit 451A lead (19), 450B lead (18), and 450 lead (17) to BILGE PUMP SWITCH.
4.
Connect circuit 38 lead (16) to instrument panel wiring harness.
5.
Connect circuit 451B lead (15) to rear BILGE PUMP ON indicator light.
6.
Connect circuit 28 lead (14) to fuel gauge.
7.
Support instrument panel (6) on two struts (7).
8.
Install ground lead (11) and new lockwasher (10) on upper support (13). Install panel (6) with two mounts (12) on
support (13). Secure with two screws (8) and flat washers (9).
9.
Install panel (6) on two struts (7). Secure with two nuts (1), mounts (2) and (3), flat washers (4), and screws (5).
0289 00-11
0289 00
TM 9-2350-261-20-2