TM 9-2350-261-20-2
REPLACE UTILITY OUTLET RECEPTACLE (ALL EXCEPT M577A2
AND M1068) — Continued
0329 00
INSTALLATION
1.
If removed, install new grommet (1) from master switch panel (2).
NOTE
Make sure receptacle cover retaining chain is installed on lower screw.
2.
Place utility outlet receptacle (3) on rear of master switch panel (2). Secure with two new lockwashers (4) and screws (5).
3.
Route utility outlet receptacle lead (6) through grommet (1). Install shell connector (7) and slotted washer (8).
032900-3