TM 9-2350-261-20-2
REPLACE BILGE PUMP CIRCUIT BREAKERS
0327 00
THIS WORK PACKAGE COVERS:
Removal (page 0327 00-1).
Installation (page 0327 00-2).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0780 00, Item 29)
Materials/Parts
Gasket
Locknut (8)
Locknut (4)
Personnel Required
Unit Mechanic
Equipment Condition
Engine stopped/shutdown (see your -10)
Carrier blocked (see your -10)
Battery ground lead disconnected (WP 0294 00)
REMOVAL
1.
Remove eight screws (1), washers (2), and locknuts (3) from master switch panel (4) and distribution box (5). Remove
master switch panel from distribution box. Discard locknuts.
2.
Disconnect circuit 450 lead (6) and circuit 450A lead (7) from front bilge pump circuit breaker (8).
3.
Disconnect circuit 450B lead (9) and circuit 450C lead (10) from rear bilge pump circuit breaker (11).
4.
Remove four locknuts (12), screws (13), and two circuit breakers (8) and (11) from distribution box (5). Discard
locknuts.
032700-1