TM 9-2350-261-20-2
REPLACE TRANSMISSION AND LOWER ACCELERATOR LINKAGE — Continued
0397 00
9.
Connect three wiring harness connectors (1) to receptacles on driver’s compartment bulkhead.
10. Install wiring harness (2) on transmission cross-shaft bracket (3). Secure with two clamps (4) and screws (5).
FOLLOW-THROUGH STEPS
1.
Adjust transmission cross-shaft linkage (WP 0401 00).
2.
Install hull bottom access cover (WP 0434 00).
3.
Install air control valve (WP 0187 00).
4.
Install air cleaner housing and element (WP 0185 00).
5.
Install driver’s power plant access panel (WP 0430 00).
6.
Close power plant front access door and raise trim vane (see your -10).
7.
Operate carrier (see your -10). Check that transmission cross-shaft linkage operates properly.
END OF TASK
0397 00-6