TM-9-2350-261-20-2

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 2 OF 4

  TM-9-2350-261-20-2 - Page 841 of 1008

TM 9-2350-261-20-2
REPLACE UPPER ACCELERATOR LINKAGE — Continued
0399 00
INSTALLATION
NOTE
Lubricate rod end bearings before assembling. Use GAA grease (WP 0120 00).
1.
Apply thin coat of antiseize compound to cleaned threads of three screws (4) and (8).
2.
Install bracket assembly (3) on power plant. Secure with two screws (8), new lockwashers (9), and nuts (10). TIGHTEN
SCREWS TO 300-324 LB-IN (34-37 N·M) TORQUE. Use torque wrench and socket wrench set.
3.
Install screw (4) and new lockwasher (7) in bottom hole of bracket assembly (3). TIGHTEN SCREW TO 264-288
LB-IN (30-33 N·M) TORQUE. Use torque wrench and socket wrench set.
4.
Position inner transfer shaft (5) and outer transfer shaft (6) in bracket assembly (3). Secure with screw (2) and new
locknut (1). Use cross-tip screwdriver.
039900-3


Back to Top