TM-9-2350-261-20-3

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 3 OF 4

  TM-9-2350-261-20-3 - Page 38 of 932

TM 9-2350-261-20-3
REPLACE TRIM VANE RELEASE — Continued
0424 00
6.
Lower trim vane (see your -10) and secure in safe position for access to trim vane release handle (11).
7.
Lift and secure spring-loaded trim vane release handle (11) for access to internal parts.
8.
Remove cotter pin (14), straight pin (12), and clevis rod end (13) from trim vane release (2). Retain cotter pin until
adjustments are complete.
9.
Loosen nut (15) and turn clevis rod end (13) to change length of clevis rod. Tighten nut.
10. Install clevis rod end (13), straight pin (12), and retained cotter pin (14) on trim vane release linkage (2).
11. Check that trim vane release linkage (2) provides overcenter lock in retracted position. Repeat adjustment procedure
for clevis rod ends on extension linkage and trim vane release, if necessary.
12. Remove and discard retained cotter pin (6) from pin (8) on extension linkage clevis rod end (7). Install new cotter pin (6).
13. Remove and discard retained cotter pin (14) from straight pin (12) on trim vane release linkage (2). Install new cotter
pin (14).
FOLLOW-THROUGH STEPS
1.
Raise trim vane (see your -10).
END OF TASK
0424 00-4


Back to Top