TM 9-2350-261-20-3
REPLACE POWER PLANT DOOR — Continued
0427 00
3.
Install bracket (4) on left end of power plant door (6), with door in open position. Secure brackets (3) and (4) to hull with
four washers (2), and screws (1). Do not tighten screws.
NOTE
Do Step 4 if power plant door does not clear top of opening.
4.
Place plates (5) under brackets (3) and (4). After each plate is installed, tighten screws (1) until power plant door (6)
clears top of opening.
5.
TIGHTEN FOUR SCREWS (1) TO 216-240 LB-IN (24-27 N·M) TORQUE. Use torque wrench.
6.
Remove lifting device and sling from power plant door.
FOLLOW-THROUGH STEPS
1.
Close and lock power plant door (see your -10).
2.
Connect and raise trim vane (see your -10).
END OF TASK
0427 00-4