TM 9-2350-311-10
Item
No.
15
Interval
Before
Table 2–1. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
FOR M109 SELF-PROPELLED HOWITZER — CONTINUED
Location
Item to Check/
Service
Hydraulic
Power Pack
Reservoir
Crewmember
Procedure
CHIEF OF SECTION
Before firing, check fluid level in sight gage (1). If
pressure gage (2) reads between 925 and 1225
psi (6378 and 8446 kPa), the system is fully
charged and fluid level should be at the FULL AF-
TER PUMPING mark (3) on power pack gage (4).
Add hydraulic fluid (item 20, Appx D) to power pack
reservoir, if needed, and check fluid level again on
power pack gage. Hydraulic fluid should be up to
FULL AT 0 PRESSURE mark (5). If power pack
reservoir is over full, drain hydraulic fluid to proper
level according to the following instructions:
Not Fully Mission
Capable If:
2-27