TM 9–2350–311–20–2
6–27
d.
Testing
1
Loosen two hex nuts (7) at ports M–1 and M–2. Drain fluids from manual elevation tubes (8) into utility pail.
2
Remove accumulator cap (9) and air valve cap (10) from accumulator (3).
NOTE
Each check with tire pressure gage will deplete pressure by approximately 20 psi (137.90 kPa).
3
Use tire pressure gage to check nitrogen pressure at valve (11).
NOTE
If precharged pressure is below 75 psi (517 kPa), charge the accumulator (para 19–3).
4
Tighten two hex nuts (7) to secure manual elevation tubes (8).
5
Install air valve cap (10) and accumulator cap (9) on accumulator (3).
6
Rotate manual elevation hand pump handle (12) counterclockwise. Rotate until movement is detected in
elevating cylinder. Then, bleed elevating cylinder (para 6–3a.).
12
7
8
9
10
3
11


Back to Top