TM-9-2520-270-34

HYDROMECHANICAL CROSSDRIVE, TRANSMISSION HMPT 500 AND TRANSMISSlON CONTAINER ASSEMBLY

TECHNICAL MANUAL; DIRECT AND GENERAL SUPPORT MAINTENANCE

NOVEMBER 1984

  TM-9-2520-270-34 - Page 680 of 933

TM 9-2520-270-34
11. CLEAN LEFT-HAND OUTPUT
CARRIER ASSEMBLY (1).
a. Clean assembly and hardware. See
page 2-2.
12. INSPECT LEFT-HAND OUTPUT
CARRIER ASSEMBLY (1).
a. Inspect assembly and hardware. See
page 2-5.
b. Replace output carrier assembly (1)
if damaged. Record failure on
DA FORM 2407 and return defective
output carrier assembly to depot.
13. IF LEFT-HAND OUTPUT CARRIER
ASSEMBLY (1) WAS REPLACED,
GO TO END OF TASK. IF NOT,
GO TO STEP 14.
14. POSITION HUB (2) ON OUTPUT
CARRIER (1).
15. INSTALL 12 SCREWS (3) IN HUB (2).
a. Coat threads of 12 screws (3) with
sealant compound.
b. Install 12 screws (3) in hub (2).
16. USING 1/2-lNCH DRIVE TORQUE
WRENCH, TORQUE 12 SCREWS (3) TO
20-25 ft-lb (3 mkg).
17. INSTALL LOCKWIRE (4).
a. Using wire-twister pliers, install
Iockwire (4) through 2 screws (3).
Repeat for remaining 10 screws.
END OF TASK
Change 2
4-347


Back to Top