TM-9-2815-200-35

ENGINE, WITH CONTAINER:TURBOSUPERCHARGED, DIESEL ,FUEL INJECTION ,90-DEGREE “V” TYPE, AIR - COOLED ,12 - CYLINDER , ASSEMBLY ;MODELS AVDS-1790-2M (2815-856-4996), AVDS-1790-2A AND AVDS-1790-2AM (2815-856-9005)

TECHNICAL MANUAL; DIRECT SUPPORT, GENERAL SUPPORT AND DEPOT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LISTS

  TM-9-2815-200-35 - Page 120 of 779

Figure 4-75
Note .
Camshaft lobes must be in positio n
Shown for proper injection pump timing .
Figure 4-73. Position of camshaft lobes fo r
injection pump timing .
1. Check length of bolts (A) securing fuel injection pump
mounting base to crankcase. Discard bolts that are 1-
7 / 32 in. long and replace with the correct 1-3 / 8 in.
long bolts (5305-725-0154) and lock washers (5310-
584-5272). Torque tighten bolts to 720 to 780 pounds-
inch.
2. Position new preformed packing (B) on mounting
base oil transfer tube.
Figure 4-74. Installing preformed packin g
on fuel injection pump mounting base oi l
transfer tube .
4-38


Back to Top