TM-9-2815-210-34-2-2

ENGINE ASSEMBLY, DIESEL (MULTIFUEL): NATURALLY ASPIRATED OR TURBOCHARGED, FUEL-INJECTED, WATER-COOLED, 6-CYLINDER

TECHNICAL MANUAL; TROUBLESHOOTING; DIRECT SUPPORT AND GENERAL SUPPORT LEVEL; VOLUME 2 OF 2; PART 2 OF 2

APRIL 1981

  TM-9-2815-210-34-2-2 - Page 248 of 968

TM 9-2815-210-34-2-2
FRAME 18
NOTE
In machine shop, do this frame only if cylinder head is
tagged for resurfacing.
If cylinder head is not tagged,
go to frame 19.
No more than a total of 0.005 inch can be machined off
gasket surface of cylinder head (1). If cylinder head
has been resurfaced before, amount of metal machined
off is stamped or etched on front of cylinder head about
1/2 inch from gasket surface.
1.
2.
3.
GO
In machine shop, resurface cylinder head (1) until no scratch or gouge is
deeper than 0.001 inch.
Resurface cylinder head until it is not out-of-flat
lengthwise by more than 0.005 inch or out-of-flat crosswise by more than
0.003 inch.
If more than a total of 0.005 inch must be machined off to do this,
get a new cylinder head.
NOTE
If old cylinder head (1) can be resurfaced without
machining off more than a total of 0.005 inch, do step 2.
In machine shop, add amount of metal just machined off cylinder head (1) to
amount machined off before, and stamp or etch total on front of cylinder head
about 1/2 inch from gasket surface.
Measure thickness of cylinder head (1) from gasket surface to bottom of valve
spring counterbores (2).
If thickness is less than 3.365 inches, get a new
cylinder head.
TO FRAME 19
4-229


Back to Top