TM-9-2815-210-34-2-2

ENGINE ASSEMBLY, DIESEL (MULTIFUEL): NATURALLY ASPIRATED OR TURBOCHARGED, FUEL-INJECTED, WATER-COOLED, 6-CYLINDER

TECHNICAL MANUAL; TROUBLESHOOTING; DIRECT SUPPORT AND GENERAL SUPPORT LEVEL; VOLUME 2 OF 2; PART 2 OF 2

APRIL 1981

  TM-9-2815-210-34-2-2 - Page 415 of 968

TM 9-2815-210-34-2-2
(a) Adjustment of adjusting screw type nozzle.
FRAME 1
1.
2.
3*
4.
5.
6.
GO
Unscrew connector tube (1) and take off nozzle and holder assembly (2).
Put nozzle and holder assembly (2) in a soft-jawed vise.
Hold locknut (3).
Takeoff cap (4) and gasket (5).
NOTE
Turn adjusting screw (6) to the right to increase pres-
sure, and to the left to decrease pressure. Opening
pressure should be between 3050 to 3150 psi.
Turn adjusting screw (6) to the right or to the left to increase or decrease
pressure.
Tighten locknut (3).
Take nozzle and holder assembly (2) out of vise. Do
nozzle opening pressure test. Refer to para 4-40a (1).
Do steps 1 through 5 again until pressure is between 3050 to 3150 psi. If not,
disassemble, clean and inspect, and repair nozzle. Refer to para 4-40b, c, an
d .
TO FRAME 2
4-396


Back to Top